Observation: Site-96 Protocol Delta

Wiki Article

The object is manifesting unusually. Monitors are registering fluctuations in the spatial continuum readings. Security measures have been escalated to Code Omega. Personnel are on standby for intervention. Further analysis is critical.

Incident Log - Site-96

On 2023/12/08, at approximately 14:37 hours, a containment breach occurred within Site-96. The secondary anomaly involved SCP-9321. Initial reports indicate website that the anomalous being breached its restricted area through violent force.

Security protocols were immediately activated, resulting in a full quarantine of the facility. Personnel within Site-96 are currently evacuatingthe premises . Recovery efforts are {ongoing{, with specialized mobile task forces deployed to contain the entity and assess the extent of the damage.

The situation remains volatile. Further updates will be provided as they become available.

Addendum to Site-96 Security Procedures

This document serves as an supplement to existing security protocols for Site-78. The following changes are to be implemented immediately. All personnel should familiarize themselves with the updated procedures. Any breach of these guidelines will result in reprimand, as determined by Site Command.

Please distribute this addendum to all relevant parties and ensure its understanding. Any questions or issues should be directed to Site Command.

Anomaly Assessment: Site 96 Sublevel Gamma

This evaluation of Anomaly Protocol Gamma at Site 96's layer involves a detailed study of observed events. Our initial objective is to quantify the nature and extent of the anomaly, weighing all available evidence. Initial reports suggest a potential breach in regulation, with considerable implications. Further investigation is essential to contain the anomaly and maintain the safety of personnel and operations.

Personnel of specialized researchers has been dispatched to Site 96. Their focused task is to compile additional information through interviews. Simultaneously, a temporary lockdown has been activated on Sublevel Gamma to minimize further possible breaches. The incident is actively monitored closely, and updates will be released as they become forthcoming.

Site-96 Personnel Log: Incident Report revealed ██/██/████

Personnel log entry for incident report submission/logging/filing number ███████. The incident/event/occurrence took place at approximately 1400 hours on ██/██/████. Affected personnel involved include: Dr. Garcia, Researcher Level three; Agent Miller, Security Level three; and [DATA EXPUNGED], unknown designation/unidentified entity/classified role. The primary cause of the incident was a system malfunction/equipment failure/anomalous event. Initial assessment suggests minimal damage to Site-96 infrastructure/facilities/operations.

Further investigation is currently underway/in progress/being conducted by the incident response team/research division/security detail led by Dr. Smith. A full report/summary/analysis will be available/compiled/released upon completion of the investigation. All personnel involved are accounted for and stable/safe/unharmed at this time.

Subject Retrieval: Site Ninety-Six, SCP-XXXX

An anomalous manifestation occurred at Site Ninety-Six on date. A unrecorded entity designated as SCP-XXXX was detected during a routine evaluation. Initial reports indicate SCP-XXXX possesses the ability to alter human awareness. Further study is required to determine the full extent of SCP-XXXX's powers. Security procedures at Site Ninety-Six have been reinforced pending further understanding of this incident.

Personnel are advised to remain observant and report any unusual phenomena. A full report will be provided once a more thorough assessment of SCP-XXXX is obtained.

Report this wiki page